Manufactured Housing

Below are a few guidelines for manufactured homes:                             

  • All entrance doors must have steps leading to them.
  • Entrance doors swinging out shall have a minimum 3’ X 3’ landing outside the door (not applicable for screen or storm door).
  • All steps are in accordance with the North Carolina Regulations for Manufactured Homes section 3.11 (Pg. 55).
  • A deck greater than 36 square feet requires a separate building permit.

For a manufactured home permit, you will need to submit:

        Zoning Permit      
    
The Planning & Zoning office is located at 227 Lisbon Street. The office is the white house beside City Hall and across the street in front of Clinton Police Department. The phone number is (910)299-4904.

Septic Permit and Well Permit
Located in the Environmental Health Department, 405 County Complex Rd. Building B, Clinton, NC 28328. 
(unless connected to a town system) 

Signed bill of sale 
              If purchased from dealership
                                 OR
              Title or registration needed (if bill of sale is not available).

Mobile home tax permit from tax office in the county that the home is coming from 
               (if bill of sale from dealership is not provided).

Footer diagram needed for footers


Required permits are:

Set-up Permit -        
  • Single Wide      $100
  • Double-wide     $200
Footers (if needed        $50

Electrical                          $60

Plumbing                          $60

Mechanical                       $60

  • PERMITS MUST BE PURCHASED BY LICENSED CONTRACTORS IF CONTRACTORS ARE DOING THE WORK
  • HOMEOWNER CAN NOT DO THE ELECTRICAL OR PLUMBING, UNLESS HOMEOWNER WILL BE LIVING IN THE HOME ONCE IT IS COMPLETED FOR AT LEAST ONE (1) YEAR.